YogiSource.com my account | view cart | customer service
 Search:    
Welcome to the new Yoga.com Forums home!
For future visits, link to "http://www.YogiSource.com/forums".
Make a new bookmark.
Tell your friends so they can find us and you!

Coming soon ... exciting new changes for our website, now at YogiSource.com.

Search | Statistics | User Listing View All Forums
You are logged in as a guest. ( logon | register )



Piston concrete pump truck
Moderators: Moderators

Jump to page : 1
Now viewing page 1 [25 messages per page]
View previous thread :: View next thread
   Yoga -> General YogaMessage format
 
hhm1020
Posted 2018-11-18 10:32 PM (#246923)
Subject: Piston concrete pump truck


Expert Yogi

Posts: 8285
500020001000100100252525
1. before starting up
(1) check the adequacy of engine oil, cooling water, clutch fluid, hydraulic oil and cleaning water. The control rods of concrete pumps should be placed in the middle position. Obey the driving rules. ·
(2) when the concrete pump truck arrives at the construction site, it should be put on the horizontal dense ground. It is not allowed to park on the slope to prevent the occurrence of automatic sliding.
(3) The lower parts of the front and rear legs of the pump truck should be padded with thick wooden boards so that each leg can bear uniform force and reduce the pressure on the ground. After stopping, the two front wheels of the pump truck are landed to reduce the load of the front leg cylinder and increase the stability of the pump truck.
(4) When pumping concrete vertically, a horizontal straight pipe more than 10m long should be laid between the outlet of the pump truck and the vertical riser.
(5) the pump boom is usually made of three folding arms. In the transportation state, the three boom is tortuous back and forth. When the site moves in short distance, the third boom must be retracted. The first and second booms should be moved back to the rear of the pump truck and lowered to the horizontal position. The rotating support device of the distribution rod should be locked, allowing the pump truck to move slowly at a speed lower than 10 km/h, so as to ensure the stability of the pump truck when it moves. Of course, it is best to shrink the boom and move it again.
(6) confirm that concrete meets pump requirements. Generally, the slump of concrete is 5~23cm. When using 100mm conveyor pipe, the maximum particle size of aggregate should not exceed 25mm, and when using 125mm conveyor pipe, the maximum particle size of aggregate should not exceed 40mm. ·
(7) when the wind speed is above 10m/s (Grade 5 wind), the use of cloth poles is prohibited.
Mailbox: contact@evpvacuum.com


Website source: www.evpvacuum.com


Related products:

read more:




Top of the page Bottom of the page
Jump to page : 1
Now viewing page 1 [25 messages per page]
Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread


(Delete all cookies set by this site)