YogiSource.com my account | view cart | customer service
 Search:    
Welcome to the new Yoga.com Forums home!
For future visits, link to "http://www.YogiSource.com/forums".
Make a new bookmark.
Tell your friends so they can find us and you!

Coming soon ... exciting new changes for our website, now at YogiSource.com.

Search | Statistics | User Listing View All Forums
You are logged in as a guest. ( logon | register )



porcelain, so as to avoid the uneven heating
Moderators: Moderators

Jump to page : 1
Now viewing page 1 [25 messages per page]
View previous thread :: View next thread
   Yoga -> General YogaMessage format
 
hhm1020
Posted 2017-06-19 7:05 AM (#231463)
Subject: porcelain, so as to avoid the uneven heating


Expert Yogi

Posts: 8285
500020001000100100252525

should be used step by step in the first time. When using the geothermal floor, consumers must pay attention to heating the floor and floor step by step. When installed, the surface temperature should be kept at about 18 degrees celsius. Before installation, gradually increase the temperature of the cement ground, increase by 5 degrees per day until the standard of about 18 degrees celsius. In the first 3 days after the installation, continue to maintain the


temperature, 3 days after the warming up according to the needs, and can only be increased by 5 degrees per day. The first use of geothermal heating, attention should be slowly warming. For the first time, three days before the beginning of heating, the temperature should gradually rise: the first day of water temperature of 18 degrees, second days, 25 degrees, third days, 30 degrees, fourth days can rise to normal temperature, that is, the temperature of 45


degrees, the surface temperature of 28 ~ 30 degrees. If you don't heat up too fast, the floor may crack and twist because of expansion. After a long period of time, the geothermal heating system should be used again, and it should be heated in accordance with the heating procedure as it was for the first time. Two, the surface temperature is not too high to note is that the use of geothermal heating, the surface temperature should not exceed 28 degrees, the water


labor cost for handrail replacement only on a deck

temporary patio flooring environment

outdoor wpc wood flooring supplier uk

Top of the page Bottom of the page
Jump to page : 1
Now viewing page 1 [25 messages per page]
Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread


(Delete all cookies set by this site)